Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
2011 NPS Visitor Hiker WTP

Life Cycle Benefit Calculation View

Progress

Introduction
This tool generates a variety of basic life cycle benefit stock statistics for DevTreks outputs.

Calculation View Description
v210a

Version: 1.7.0

Feedback About commercial/output/2011 NPS Visitor Hiker WTP/2141223450/outputlcaprogress1

Step 1 of 3. Make Selections


Date:

Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Aggregate Using:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions

Step 1

  • Step 1. Base Calculations To Analyze: Choose the one option offered in this version of the analyzer.
  • Step 1. Analysis Type: Totals add together the resource stocks being analyzed. Mean and Standard deviation is not available yet.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying LCA calculator after inserting, deleting, or updating, this linked view (that keeps the LCA calculator's linked views synchronized with these linkedviews).


Current view of document
2011 NPS Visitor Hiker WTP
Output Group : National Park Recreation Outputs ; NPS101
Output AllAlt. 0
Name 2011 NPS Visitor Hiker WTP
Label NPS10012
Output Series AllAlt. 0Alt. 1Alt. 2Alt. 3Alt. 4
Name 2007 NPS Visitor Hiker WTP2008 NPS Visitor Hiker WTP2009 NPS Visitor Hiker WTP2010 NPS Visitor Hiker WTP2011 NPS Visitor Hiker WTP
Label NPS10012NPS10012NPS10012NPS10012BNPS10012B
Observations 11111
Target benchmarkactualactualactualactual
R Plan Period 52.0052.0052.0042.5045.00
R Plan Full 52.0052.0052.000.000.00
R Plan Cumul 52.0052.0052.000.000.00
R Actual Period 0.0038.5040.0042.5045.00
R Actual Cumul 0.0038.5078.50121.00166.00
R Actual Period Change 0.00-13.50-12.000.000.00
R Actual Cumul Change 0.00-13.5026.50121.00166.00
R Plan P Percent 0.0074.0476.92100.00100.00
R Plan C Percent 0.0074.04150.960.000.00
R Plan Full Percent 0.0074.04150.960.000.00
LCB Plan Period 52.0052.0052.0042.5045.00
LCB Plan Full 52.0052.0052.000.000.00
LCB Plan Cumul 52.0052.0052.000.000.00
LCB Actual Period 0.0038.5040.0042.5045.00
LCB Actual Cumul 0.0038.5078.50121.00166.00
LCB Actual Period Change 0.00-13.50-12.000.000.00
LCB Actual Cumul Change 0.00-13.5026.50121.00166.00
LCB Plan P Percent 0.0074.0476.92100.00100.00
LCB Plan C Percent 0.0074.04150.960.000.00
LCB Plan Full Percent 0.0074.04150.960.000.00
EAA Plan Period 0.000.000.000.000.00
EAA Plan Full 0.000.000.000.000.00
EAA Plan Cumul 0.000.000.000.000.00
EAA Actual Period 0.000.000.000.000.00
EAA Actual Cumul 0.000.000.000.000.00
EAA Actual Period Change 0.000.000.000.000.00
EAA Actual Cumul Change 0.000.000.000.000.00
EAA Plan P Percent 0.000.000.000.000.00
EAA Plan C Percent 0.000.000.000.000.00
EAA Plan Full Percent 0.000.000.000.000.00
Unit Plan Period 52.0052.0052.0042.5045.00
Unit Plan Full 52.0052.0052.000.000.00
Unit Plan Cumul 52.0052.0052.000.000.00
Unit Actual Period 0.0038.5040.0042.5045.00
Unit Actual Cumul 0.0038.5078.50121.00166.00
Unit Actual Period Change 0.00-13.50-12.000.000.00
Unit Actual Cumul Change 0.00-13.5026.50121.00166.00
Unit Plan P Percent 0.0074.0476.92100.00100.00
Unit Plan C Percent 0.0074.04150.960.000.00
Unit Plan Full Percent 0.0074.04150.960.000.00
SubBenefit Totals
SubBenefit 1 Name Willingness To PayWillingness To PayWillingness To PayWillingness To PayWillingness To Pay
SubBenefit 1 Amount 1.0001.0001.0001.0001.000
SubBenefit 1 RUnit visitorvisitorvisitorvisitorvisitor
SubBenefit 1 Price 30.0021.0022.0023.5025.00
SubBenefit 1 Total 30.0021.0022.0023.5025.00
SubBenefit 1 Total Per RUnit 30.0021.0022.0023.5025.00
SubBenefit 2 Name Nature Education CapitalNature Education CapitalNature Education CapitalNature Education CapitalNature Education Capital
SubBenefit 2 Amount 1.0001.0001.0001.0001.000
SubBenefit 2 RUnit visitorvisitorvisitorvisitorvisitor
SubBenefit 2 Price 22.0017.5018.0019.0020.00
SubBenefit 2 Total 22.0017.5018.0019.0020.00
SubBenefit 2 Total Per RUnit 22.0017.5018.0019.0020.00
Dataset: 2011 NPS Visitor Hiker WTP IRI This building construction benefit estimate is computed using life cycle cycle output calculators and totals, statistics, incremental change, and progress analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.